Central Library (Level 1) Refresh – Coming Soon!

 

Exciting changes are coming to the Central Library!

Refurbishment works on level 1 — including much-needed carpet replacement — are scheduled to take place from 24 August to approximately early November, with normal services expected to resume afterwards.

What’s happening

A significant part of level 1 will be closed off for the duration of the works. Some services will be temporarily relocated, and alternative accessible

pathways will be in place to reach spaces that remain open. Please note there will be some noise from the works during this time.
Accessibility

There will be changes to access, including to the North Ridge Accessible Path. Please follow directions on signage (which will be in place later this month), or speak to library staff on level 0 (near Flinders Connect) or level 2 of the Hub for assistance.

Stays open and accessible

  • HDR Central — via the lifts (please follow directional signage)
  • Levels 2 and 3 — via the lifts (please follow directional signage)

There will be a pop-up library in the Hub on level 2. The returns chute remains open, and Holds and Document Delivery items will be borrowable during staffed hours at the pop-up.

Getting around

A roving staff member will be stationed on level 0 to help, and directional signage will be in place throughout the building to guide you.

More details on other service relocations will follow soon — thanks for bearing with us while we give level 1 a well-deserved refresh!

Posted in
Uncategorised

Leave a Reply