North Ridge electrical shutdown works – scheduled for July
Electrical shutdown works will occur across North Ridge buildings, Flinders Living and HMRB over weekends in the July mid-semester break.
Buildings and lifts will be closed during works. If you work in these locations, a program for the works will be communicated in the coming weeks.
HMRB Safety Switch (RCD) and Lab E-Stop Point Testing
From 5am to 8am this week and continuing until Thursday 15 May, Safety Switch (RCD) and Lab E-Stop Point Testing is underway on levels of the HMRB to meet mandatory compliance obligations and keep everyone safe.
Works involve a brief power outage, so please save your work before you leave each day.
Tonsley façade works
If you work in or visit our Tonsley campus, note that works are underway to replace some panels on the northern and southern façades and around some doorways.
Panels are being measured this week so replacement panels can be manufactured. These will be installed from June to August. An elevated work platform and scaffold will be used, so please be aware of your surroundings, follow any directions on signage and don’t cross into the work zone.
Biological Science building
Works are ongoing in the Biological Sciences building on level 1 and 2 spaces. Please don’t cross into exclusion zones and follow any detours on the signs around the works.
SALHN works on University Drive
From 7am to 2pm on Saturday 10 May, SA Local Health Network will be partially closing one lane on the western side of University Drive for works on the Margaret Tobin Centre redevelopment.
The area’s 25km per hour speed limit and pedestrian access remain the same, however please follow directions on traffic management signage and to merge into the right lane during works.