Disability relevant news re: work in Flinders Laneway and Breezeway

 

There are two projects occurring in these areas over the coming weeks:

1. A refresh of the Flinders Laneway which includes pavement painting, gardening works and new furniture.

At this time the pavement painting weekend works are now scheduled for:

  • Friday 28 Sept – Monday 30 Sept &
  • Friday 4 Oct –  Tuesday 7 Oct.

2. Fire detection and lighting upgrading works in the Breezeway (Transition Walkway)

Please note, access to the area around the theatre side entrance, foyer and the toilet thoroughfare will be limited at various times from Friday 20 September 3pm – Tuesday 8 October. Please follow all signage to navigate the area during these times.

 

Both these works will involve temporary pedestrian diversions and intermittent noise associated with pressure cleaning, furniture installation and low level drilling.

 

Posted in
Disability News

Leave a Reply