New Lift at HCD should be working by the 27th February

 

Anyone who has visited Health, Counselling and Disability Services over the last couple of months would have noticed that we are having our lift replaced.

It has caused a bit of a disruption and lots of confusion with students needing to check-in at the bottom of the Union building before making their way to Level 3 in the Student Centre.

I’ve been notified that we don’t have long to wait before our new lift is ready – 27th February is the current estimate.

I’ll definitely update you with some stunning lift photography once it is installed.

In the meantime, if you have any suggestions for what we can informally call our new lift (I believe it deserves a name), send them through to gareth.furber@flinders.edu.au

 

Posted in
Disability News News

Leave a Reply